Framed Structure : RCC framed structure to withstand wind & seismic loads
Super Structure : 8"/9" Thick bricks/blocks work for external walls and 4"/5" thick bricks/blocks for internal walls
PLASTERING INTERNAL
External : Double coat cement plaster of 12mm thick with smooth finishing
Internal : Cement plastering with 2 coats of luppam finished to zero level
DOORS
Main Door Frame : Best quality Teak wood frame with melamine/PU finish with 8' entrance
Main Door Shutter : 40mm Both sides Teak veneer shutter with melamine/PU finish
Internal Door Frame : Best quality hardwood door frame with polish/paint
Internal Door Shutter : BWP grade both sides 1mm thick laminate
French Doors(If any) : Anodized aluminum/uPVC door frames with performance glass acoustically treated/tinted float glass panelled shutters & designer hardware of best brands
Windows : Anodized aluminum/uPVC door frames with plain/tinted float glass with suitable finishes as per design, provision for mosquito mesh track
Balconies : Treated with sound reflecting material in a livable decibels level
PAINTING
External : Textured finish & two coats of exterior emulsion paint with architectural features
Internal : Smooth finish with two coats of premium acrylic emulsion paint of best brands over a coat of primer
FLOORING
Living & Dining : 800mm x 800mm double charged vitrified tiles
Bathrooms : Anti-skid ceramic tiles Corridors: Granite/marble/SVGT tiles
Living Balconies : Anti-skid vitrified/ceramic tiles
Staircase : Granite/marble/Kota stones
TILE CLADDING
Dadoing in kitchen : Glazed ceramic tiles dado up to 2' height above kitchen platform (optional)
Bathrooms : Glazed ceramic tile dado up to full height/ceiling height
Utilities : Rustic vitrified tile of SKGT. Tile dado up to 3' height
KITCHEN
» Granite platform with stainless steel sink
» Separate Municipal tap(Manjeera or any other water provided by GHMC qalong with borewell water)
» Provision for fixing of water RO system, exhaust fan & chimney
» Provision for geyser for hot water near the sink
Utilities/Wash : Dish washer & washing machine provision in Utility area
BATHROOMS
» Vanity type washbasin/countertop in master bedroom
» EWC with vertical stack flushing system with hydro-pneumatic system
» Single lever fixture with wall mixer cum shower
» Provision for geysers in all bathrooms
» All CP fittings are chrome plated(Grohe, Hans Grohe, Roko or equivalent)
» Sanitary TOTO, Kohler, Vitra or equivalent
ELECTRICAL
» Concealed copper wiring(Havells or equivalent)
» Power outlets for air-conditioners in all bedrooms
» Power outlets for geysers in all bathrooms
» Power plugs for cooking range chimney, refrigerators, microwave ovens,
» mixer/grinders in kitchen, washing machine
» Three-phase supply for each unit & individual meter boards
» Elegant designer modular electrical switches Miniature Circuit
» Breakers(MCB) for each distribution board of the distribution board
TELECOM
» Telephone points in master bedroom, living room
» Intercom facility to all the units connecting Security
CABLE TV
» Provision for cable connection in master bedroom & living room
INTERNET
» One Internet connection provision in each apartment
LIFTS
» Four high speed automatic passenger lifts with rescue device with V3F for energy efficiency with granite/marble/tile cladding and one service lift(Make of Schindler/Mitsubishi/Otis)
» Granite/marble cladding at ground level at lift lobby
» Vitrified tiles/granite tile cladding at other levels of lift lobby
WTP & STP
» Fully treated water made available through exclusive water softening & purification plants for each unit
» A Sewage Treatment Plant of adequate capacity as per norms will be provided inside the project; treated sewage water will be used for landscaping & flushing purposes
» The water from the terrace & open areas will be collected through rain water pipes, which will be discharged in rainwater harvesting pits to recharge the ground water
GENERATOR
» 100% DG set backup with acoustic enclosure & AMF
FACILITIES FOR THE PHYSICALLY CHALLENGED
» Access ramps at all entrances shall be provided for Physically Challenged
SECURITY/BMS
» Sophisticated, round the clock security system
» The complete building shall be provided with Building Management
» System with all facilities
» Panic button and Intercom are provided in the lifts connected to the Security room
» Surveillance cameras at the main Security & Entrance of each block to monitor
» Video door phone for each apartment connected to Security for screening of visitors
» Solar powered security fence for total compound
PARKING MANAGEMENT
» Entire parking is well designed to suit the number of car parks required
» Parking signage and equipment at required place to improve driving comfort
CLUBHOUSE & AMENITIES
» Well designed clubhouse of 23,000 Sft with facilities like creche with children play equipment, laundry facilities, multi-purpose hall, squash, bowling etc
» Swimming pool with changing rooms & open showers
» Separate rooms for associations, maintenance and servant toilets
FIRE & SAFETY
» Fire hydrant & fire sprinkler system in all the floors & basements
» Fire alarms & public address system in all floors & parking areas(basements). control panels will be kept at main Security
LPG
» Supply of gas from centralized gas bank to all individual apartments with pre-paid gas meters.
 
Specifications
 
Specifications
  Spacer  
Vasavi GP Trends
Overview
Elevation
Floor Plans
Site Layout
Amenities
Specificarions
Price Sheet
Walkthrough
Location Map
Site Work Progress
Home Loan Documents
E-Brochure